Skip to content
CSR Properties

Drywall hanging and finishing in Catawba, NC

CSR Properties hangs, tapes, finishes and sands drywall for new rooms, additions, remodels and repairs. We finish to the level your paint and lighting need: Level 4 for standard painted walls, and a Level 5 skim coat for gloss paint or walls lit from a low angle.

What is included

  • Hanging board on walls and ceilings
  • Taping and three-coat finishing of joints, corners and fasteners
  • Level 5 skim coating of whole walls and ceilings
  • Corner bead and trim accessories
  • Patching holes, cracks and water-damaged sections
  • Sanding and cleanup, ready for primer

How drywall is finished

Hanging is only the first step. Screws are set just below the paper face, then every joint, inside corner and screw head is covered with joint compound. Paper or mesh tape goes into the first coat of the joints.

Each coat of compound has to dry before the next goes on, so even a small room takes several days from hanging to sanding. Rushing a coat is the usual cause of cracked joints and ridges that show through paint.

Choosing the board

Half-inch board is common for walls. Five-eighths-inch Type X board is used where a fire-rated assembly is required, such as a garage ceiling under living space. Local code decides which applies to your project.

Bathrooms, laundry rooms and tile backing call for moisture-resistant board or cement board instead of standard paper-faced drywall.

Drywall finish levels, explained

The drywall industry grades finishing from Level 0 to Level 5, defined in the GA-214 standard. The level you need depends on the paint and the light in the room. A higher level costs more labor, so we match it to the job instead of defaulting to the highest.

  1. 0No finishingNo taping or finishing. Temporary construction, or surfaces that will be covered.
  2. 1TapedTape embedded in compound at joints and inside corners. Used in spaces hidden from view, like above ceilings.
  3. 2One coat over tapeAdds one coat over joints, corners and fasteners. Used as the base under tile.
  4. 3Two coatsTwo coats over joints, corners and fasteners. Suited to medium and heavy textures and wall coverings.
  5. 4Three coatsThree coats over joints, corners and fasteners, sanded smooth. The standard under flat or low-sheen paint.
  6. 5Skim coatedLevel 4 plus a thin skim coat over the whole surface. For gloss paint and walls lit from a low angle.

Drywall hanging and finishing: common questions

What is the difference between a Level 4 and a Level 5 drywall finish?
Level 4 has three coats of joint compound over joints, inside corners and screw heads, and is the standard for painted walls under flat or low-sheen paint. Level 5 adds a thin skim coat over the entire surface, which evens out how the paper and compound absorb paint. It is recommended for gloss or semi-gloss paint and for walls lit from a low angle, such as a hallway beside a window.
How long does drywall finishing take?
Each coat of compound must dry before the next, so finishing a room usually spans several days even when the hands-on work is only a few hours a day. Humidity and temperature change drying times.
Can you repair a hole or water-damaged drywall?
Yes. Small holes are patched and blended into the wall. Water-damaged sections are cut back to dry, sound board and replaced. The leak or moisture source needs to be fixed first, or the damage will return.
Do you hang and finish drywall for new construction and additions?
Yes. We hang and finish new rooms, additions and basement or garage finishing, as well as repairs and remodels in existing homes.

Request a quote for drywall hanging and finishing

Tell us the rooms, the trades involved and when you want the work done. Photos of the space help. We serve Catawba County, NC and the surrounding counties.

Include a phone number or an email so we can reply.

Prefer to talk? (828) 640-4884 or colby.rash@csr-properties.com